R.79-1988

AUTOMATIC TESTS OF TRANSMISSION QUALITY ON TELEGRAPH CIRCUITS BETWEEN SWITCHING CENTRES


 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 R.79-1988 前三页,或者稍后再访问。

如果您需要购买此标准的全文,请联系:

点击下载后,生成下载文件时间比较长,请耐心等待......

 

标准号
R.79-1988
发布日期
1988年11月01日
实施日期
2010年03月29日
废止日期
中国标准分类号
/
国际标准分类号
/
发布单位
ITU-T - International Telecommunication Union/ITU Telcommunication Sector
引用标准
10
适用范围
"Purpose of automatic tests The purpose of automatic testing is to make it possible to perform rapid tests; circuits found to be ""satisfactory"" in the course of these will not be subjected to full maintenance tests and the maintenance staff can thus concentrate on making full tests of circuits identified as ""doubtful"" during the rapid tests. Automatic tests should be organized in such a way that at least at one end of the group of circuits under test@ no staff is required. This end of the circuit will then be said to be ""in the passive position""@ while the end initiating the tests will be said to be ""in the active position"". For these tests it is necessary to distinguish between trunks including regenerative equipment and those without. Tests on trunks were no regeneration is involved are dealt with in ??. Tests on trunks where regeneration is involved are dealt with in ??. Note 1 ?C Unless stated otherwise@ the end of the circuit in the active position will be denoted by the letter A and the end of the circuit in the passive position by the letter B throughout this Recommendation. Note 2 ?C Where regenerative and non-regenerative sections of the telegraph circuits are connected in tandem (e.g. national extension DT in Figure 3/R.79) the tests to be conducted shall be defined in the framework of bilateral agreements."




Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号