1793-2012

Guide for Planning and Designing Transition Facilities between Overhead and Underground Transmission Lines


 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 1793-2012 前三页,或者稍后再访问。

如果您需要购买此标准的全文,请联系:

点击下载后,生成下载文件时间比较长,请耐心等待......

 

标准号
1793-2012
发布日期
2012年12月05日
实施日期
2013年01月22日
废止日期
中国标准分类号
/
国际标准分类号
/
发布单位
IEEE - The Institute of Electrical and Electronics Engineers@ Inc.
引用标准
40
适用范围
This guide presents factors to be considered in the planning and design of transition facilities between overhead and underground transmission lines. These include the system implications of a hybrid installation as they relate to the transition facility. While this document focuses on transmission lines only@ some of the considerations listed in this guide are common to both transmission and distribution installations. Purpose The purpose of this guide is to list and describe typical factors that should be considered in the planning and designing of transition facilities between overhead and underground transmission lines. Some of these factors relate to the installation@ operation@ and maintenance of the transmission system. This guide is intended to be comprehensive@ but may not be all inclusive.




Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号