NEMA Standards Publication AB 4 sets forth@ for use by qualified personnel1@ a number of basic procedures that may be used for the inspection and preventive maintenance of molded case circuit breakers used in industrial and commercial applications rated up to and including 1000 V 50/60 Hz AC or AC/DC. Note: consult the manufacturer for dc-only or 400 Hz circuit breakers.The methods outlined may be used to verify specific characteristics of a molded case circuit breaker which was originally built and tested in compliance with the requirements of NEMA Standards Publication AB 1. These methods are intended for field application and are@ therefore@ non-destructive in nature. Accordingly@ these methods cannot be used to verify all performance capabilities of a molded case circuit breaker since verification of some capabilities requires tests of a destructive nature.Many tests@ including those of a destructive nature@ as defined in AB 1@ are performed on representative samples of circuit breakers by the manufacturer@ as part of a routine program of factory inspection.The AB 4 Standards Publication is not intended@ nor is it adequate@ to verify proper electrical performance of a molded case circuit breaker which has been disassembled@ modified@ rebuilt@ refurbished@ or handled in any manner not intended or authorized by the original circuit breaker manufacturer. Such breakers should be removed from service.1For purposes of these guidelines@ a qualified person is one who is familiar with the installation@ construction@ and operation of the equipment and the hazards involved. In addition@ the person is trained:??and authorized to test@ energize@ clear@ ground@ tag@ and lockout circuits and equipment in accordance with established safety practices.??in the proper care and use of protective equipment such as rubber gloves@ hard hat@ safety glasses or face shields@ and flash resistant clothing@ in accordance with established safety practices.??in first aid.
AB 4-2009由NEMA - National Electrical Manufacturers Association 发布于 2009-01-01,并于 2009-06-10 实施。
非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 AB 4-2009 前三页,或者稍后再访问。
点击下载后,生成下载文件时间比较长,请耐心等待......
Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号