HB-17 DIVISION II SEC 4-2002

Division II Construction - Driven Foundation Piles


 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 HB-17 DIVISION II SEC 4-2002 前三页,或者稍后再访问。

如果您需要购买此标准的全文,请联系:

点击下载后,生成下载文件时间比较长,请耐心等待......

 

标准号
HB-17 DIVISION II SEC 4-2002
发布日期
2002年01月01日
实施日期
2003年01月24日
废止日期
中国标准分类号
/
国际标准分类号
/
发布单位
AASHTO - American Association of State Highway and Transportation Officials
引用标准
9
适用范围
DESCRIPTION This work shall consist of furnishing and driving foundation piles of the type and dimensions designated on the plans or in the special provisions including cutting off or building up foundation piles when required. This specification also covers providing test piles and performing loading tests. Piling shall conform to and be installed in accordance with these specifications@ and at the location@ and to the elevation@ penetration@ and bearing capacity shown on the plans or as directed by the Engineer. Any improperly driven@ broken@ or otherwise defective pile shall be corrected to the satisfaction of the Engineer by removal and replacement@ or the driving of an additional pile@ at no extra cost. Except when test piles are required@ the Contractor shall furnish the piles in accordance with the dimensions shown on the plans or special provisions. When test piles are required@ the pile lengths shown on the plans are for estimating purposes only and the actual lengths to be furnished for production piles will be determined by the Engineer after the test piles have been driven. The lengths given in the Engineer's order list will include only the lengths anticipated for use in the completed structure. The Contractor shall@ without added compensation@ increase the lengths shown or ordered to provide for fresh heading and for such additional length as may be necessary to suit the method of operation.




Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号