HB-17 DIVISION II SEC 10-2002

Division II Construction - Prestressing (Errata 01/2003)


 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 HB-17 DIVISION II SEC 10-2002 前三页,或者稍后再访问。

如果您需要购买此标准的全文,请联系:

点击下载后,生成下载文件时间比较长,请耐心等待......

 

标准号
HB-17 DIVISION II SEC 10-2002
发布日期
2002年01月01日
实施日期
2003年05月19日
废止日期
中国标准分类号
/
国际标准分类号
/
发布单位
AASHTO - American Association of State Highway and Transportation Officials
引用标准
11
适用范围
"Description: This work shall consist of prestressing precast or cast-in-place concrete by furnishing@ placing@ and tensioning of prestressing steel in accordance with details shown on the plans@ and as specified in these specifications and the special provisions. It includes prestressing by either the pretensioning or post-tensioning methods or by a combination of these methods. This work shall include the furnishing and installation of any appurtenant items necessary for the particular prestressing system to be used@ including but not limited to ducts@ anchorage assemblies and grout used for pressure grouting ducts. For cast-in-place prestressed concrete@ the term ""member"" as used in this section shall be considered to mean the concrete which is to be prestressed. When members are to be constructed with part of the reinforcement pretensioned and part post-tensioned@ the applicable requirement of this Specification shall apply to each method."




Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号