适用范围
The Technical Position provides tolerances on the as-built geometry of Light Water Reactor piping and pipe support locations that are considered acceptable for reconciliation with as-designed geometry. That is@ a piping system geometry that is in compliance with the plant licensing commitments based on the as-designed documentation is also considered to be in compliance if the reported as-built critical to design dimensions do not exceed the total tolerances presented in the Technical Position. Currently@ most nuclear power plant construction activities involve a significant amount of time and dollars related to reconciling the as-built piping and support locations with the as-designed configuration. This occurs because it is impractical@ if not impossible@ to fabricate and install piping and pipe supports to the exact dimensions given on the design drawings. However@ the design documentation@ including analyses@must rely on the as-designed geometry since it is necessary to determine initial design acceptability prior to release for construction. In the end any significant differences must be reconciled.




Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号