LO-09-027-2009

Required Duration For Borehole Test Validated by Field Data


 

 

非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 LO-09-027-2009 前三页,或者稍后再访问。

如果您需要购买此标准的全文,请联系:

点击下载后,生成下载文件时间比较长,请耐心等待......

 

标准号
LO-09-027-2009
发布日期
2009年01月01日
实施日期
2010年02月18日
废止日期
中国标准分类号
/
国际标准分类号
/
发布单位
ASHRAE - American Society of Heating@ Refrigerating and Air-Conditioning Engineers@ Inc.
引用标准
11
适用范围
ABSTRACT Geothermal heat pumps exchange heat with the ground through the use of ground heat exchangers where the heat transfer rate depends on the thermal conductivity of the surrounding soil. An in-situ test is often performed on a vertical borehole to estimate soil thermal conductivity@ but the test must have sufficient duration in order to obtain an accurate estimate. Conventional analysis methods usually do not check to see if the test duration is sufficient. This paper validates a procedure to perform this check as a supplement to current methods. The procedure uses an analytical composite model of borehole heat transfer to estimate the minimum test duration necessary to determine soil thermal conductivity within 5% of the estimated value from a very long test. Data sets from 16 field tests are used in the validation process. The minimum test duration ranges from approximately 10 to 53 hours among the tests when a simplified line-source model is used for evaluating soil thermal conductivity. The results indicate no simple rule for minimum duration applies to all cases. Instead@ the proposed procedure based on the analytical composite model can determine if test duration is sufficient.




Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号