ZH

RU

ES

Project effect

Project effect, Total:16 items.

In the international standard classification, Project effect involves: Electrical engineering in general, Occupational safety. Industrial hygiene, Environmental protection.


Professional Standard - Electricity, Project effect

  • DL/T 1330-2014 Effect evaluation guidelines for power demand side management program

ASHRAE - American Society of Heating@ Refrigerating and Air-Conditioning Engineers@ Inc., Project effect

  • ASHRAE SF-98-5-4-1998 Using Calibrated Engineering Models to Predict Energy Savings in Large-Scale Geothermal Heat Pump Projects

Professional Standard-Safe Production, Project effect

  • AQ/T 8010-2013 Guidelines for effect-assessment for control of occupational hazard in construction project
  • AQ/T 4260-2015 Codes for effect-assessment for occupational hazard control in construction project of asbestos mining
  • AQ/T 4262-2015 Codes for effect-assessment for occupational hazard control in construction project of asbestos producing industry
  • AQ/T 4280-2016 Detailed Rules for Evaluation of Occupational Hazard Control Effects in Construction Projects of Thermal Power Enterprises
  • AQ/T 4267-2015 Codes for effect-assessment for occupational hazard control in construction project of wooden furniture industry

Occupational Health Standard of the People's Republic of China, Project effect

  • GBZ/T 197-2007 Technical guidelines for effect-assessment for occupational hazard control in construction project

Guangxi Provincial Standard of the People's Republic of China, Project effect

  • DB45/T 1725-2018 Detailed Rules for Evaluation of Occupational Hazard Control Effects in Construction Projects of Papermaking Enterprises

US-CFR-file, Project effect

  • CFR 10-605.20-2014 Energy. Part605:The office of science financial assistance program. Section605.20:Dissemination of results.
  • CFR 10-602.18-2014 Energy. Part602:Epidemiology and other health studies financial assistance program. Section602.18:Dissemination of results.
  • CFR 48-252.232-7013-2014 Federal Acquisition Regulations System. Part252:Solicitation provisions and contract clauses. Section252.232-7013:Performance-Based Payments—Deliverable-Item Basis.

Group Standards of the People's Republic of China, Project effect

  • T/CSES 89-2023 Technical guidelines for assessment in acceptance of environmental protection for completed construction projects with the impact of pollution

GM Europe, Project effect

  • GME QK 000624-2014 Polybutylene terephthalate (Issue 2; English/German; This standard may be applied only for current programs. It is inactive for all future projects and without replacement. If this product should be used for a new project, a Re-Certification according to
  • GME QK 000623-2014 Polybutylene terephthalate (Issue 2; English/German; This standard may be applied only for current programs. It is inactive for all future projects and without replacement. If this product should be used for a new project, a Re-Certification according to
  • GME QK 001199-2014 Polyamide 6, modified (Issue 3; English/German; This standard may be applied only for current programs. It is inactive for all future projects and without replacement. If this product should be used for a new project, a Re-Certification according to GMW15




Copyright ©2007-2023 ANTPEDIA, All Rights Reserved