(a) The device(s) used to transmit signals must be tested on site before beginning operations to ensure that the signal transmission is effective, clear, and reliable.
Labor. Part1926:Safety and health regulations for construction. Section1926.1420:Signals—radio, telephone or other electronic transmission of signals.
(a) Alive or live (energized). The term means electrically connected to a source of potential difference, or elec-trically charged so as to have a poten-tial significantly different from that of the earth in the vicinity. The term ''live'' is sometimes used in place of the term ''current-carrying,''where the intent is clear, to avoid repetition of the longer term.
Labor. Part1926:Safety and health regulations for construction. Section1926.960:Definitions applicable to this subpart.
(a) General. (1) Employees shall be provided with eye and face protection equipment when machines or oper-ations present potential eye or face in-jury from physical, chemical, or radi-ation agents.
Labor. Part1926:Safety and health regulations for construction. Section1926.102:Eye and face protection
Labor. Part1926:Safety and health regulations for construction. Section1926.1:Purpose and scope.
Labor. Part1926:Safety and health regulations for construction. Section1926.1:Purpose and scope.
(a) Work near energized equipment fa-cilities. (1) When construction work is performed in an energized substation, authorization shall be obtained from the designated, authorized person be-
Labor. Part1926:Safety and health regulations for construction. Section1926.957:Construction in energized substations.
(a) General. (1) Fall protection sys-tems required by this part shall comply with the applicable provisions of this section.
Labor. Part1926:Safety and health regulations for construction. Section1926.502:Fall protection systems criteria and practices.
(a) A stairway or ladder shall be pro-vided at all personnel points of access where there is a break in elevation of 19 inches (48 cm) or more, and no ramp, runway, sloped embankment, or per-sonnel hoist is provided.
Labor. Part1926:Safety and health regulations for construction. Section1926.1051:General requirements.
When assembling or disassembling equipment (or attachments), the em-ployer must comply with all applicable manufacturer prohibitions and must comply with either:
Labor. Part1926:Safety and health regulations for construction. Section1926.1403:Assembly/Disassembly—selection of manufacturer or employer procedures.
(a) Wherever it is not feasible to re-duce the noise levels or duration of ex-posures to those specified in Table D–2, Permissible Noise Exposures, in § 1926.52, ear protective devices shall be provided and used.
Labor. Part1926:Safety and health regulations for construction. Section1926.101:Hearing protection.
(a) Boom free fall prohibitions. (1) The use of equipment in which the boom is designed to free fall (live boom) is pro-hibited in each of the following cir-cumstances:
Labor. Part1926:Safety and health regulations for construction. Section1926.1426:Free fall and controlled load lowering.
Labor. Part1926:Safety and health regulations for construction. Section1926.3:Inspections—right of entry.
Labor. Part1926:Safety and health regulations for construction. Section1926.3:Inspections—right of entry.
(a) Supervision—competent-qualified person. (1) Assembly/disassembly must be directed by a person who meets the criteria for both a competent person and a qualified person, or by a com-petent person who is assisted by one or more qualified persons (''A/D direc-tor'').
Labor. Part1926:Safety and health regulations for construction. Section1926.1404:Assembly/Disassembly— general requirements (applies to all assembly and disassembly operations).
(a) General requirements. The require-ments of paragraphs (a) and (b) of thissection shall be complied with for alllineman's body belts, safety straps andlanyards acquired for use after the ef-fective date of this subpart.
Labor. Part1926:Safety and health regulations for construction. Section1926.959:Lineman's body belts, safety straps, and lanyards.
(a) Application. Protective equipment, including personal protective equip-ment for eyes, face, head, and extrem-ities, protective clothing, respiratory devices, and protective shields and bar-riers, shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards of processes or envi-ronment, chemical hazards, radio-logical hazards, or mechanical irri-tnts encountered in a manner capable of causing injury or impairment in the function of any part of the body through absorption, inhalation or physical contact.
Labor. Part1926:Safety and health regulations for construction. Section1926.95:Criteria for personal protetive equipment.
(a) The provisions of subpart CC apply to dedicated pile drivers, except as specified in this section.
Labor. Part1926:Safety and health regulations for construction. Section1926.1439:Dedicated pile drivers.
(a) The provisions of this standard apply, except § 1926.1402 (Ground condi-tions), § 1926.1415 (Safety devices), § 1926.1416 (Operational aids), and § 1926.1427 (Operator qualification and certification).
Labor. Part1926:Safety and health regulations for construction. Section1926.1440:Sideboom cranes.
The following paragraphs of this sec-tion specify requirements for employ-ers using equipment with a maximum rated hoisting/lifting capacity of 2,000 pounds or less.
Labor. Part1926:Safety and health regulations for construction. Section1926.1441:Equipment with a rated hoisting/lifting capacity of 2,000 pounds or less.
(a) The employer must ensure that, prior to operating any equipment cov-ered under subpart CC, the person is operating the equipment during a training period in accordance with paragraph (f) of this section, or the op-erator is qualified or certified to oper-ate the equipment in accordance with the following:
Labor. Part1926:Safety and health regulations for construction. Section1926.1427:Operator qualification and certification.
(a) A signal person must be provided in each of the following situations:
Labor. Part1926:Safety and health regulations for construction. Section1926.1419:Signals—general requirments.
(a) Permanently installed overhead and gantry cranes. The requirements of § 1910.179, except for § 1910.179(b)(1), and not the requirements of this subpart CC, apply to the following equipment when used in construction and perma-nently installed in a facility: overhead and gantry cranes, including semigantry, cantilever gantry, wall cranes, storage bridge cranes, and oth-ers having the same fundamental char-acteristics.
Labor. Part1926:Safety and health regulations for construction. Section1926.1438:Overhead & gantry cranes.