C00 标准化、质量管理 标准查询与下载



共找到 200 条与 标准化、质量管理 相关的标准,共 14

Whenever there is a concern as to safety, the operator must have the au-thority to stop and refuse to handle loads until a qualified person has deter-mined that safety has been assured.

Labor. Part1926:Safety and health regulations for construction. Section1926.1418:Authority to stop operation.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) A signal person must be provided in each of the following situations:

Labor. Part1926:Safety and health regulations for construction. Section1926.1419:Signals—general requirments.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) The device(s) used to transmit signals must be tested on site before beginning operations to ensure that the signal transmission is effective, clear, and reliable.

Labor. Part1926:Safety and health regulations for construction. Section1926.1420:Signals—radio, telephone or other electronic transmission of signals.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

Labor. Part1926:Safety and health regulations for construction. Section1926.4:Rules of practice for administrative adjudications for enforcement of safety and health standards.

Labor. Part1926:Safety and health regulations for construction. Section1926.4:Rules of practice for administrative adjudications for enforcement of safety and health standards.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) Prior to beginning operations, the operator, signal person and lift director (if there is one), must contact each other and agree on the voice signals that will be used. Once the voice sig-nals are agreed upon, these workers need not meet again to discuss voice signals unless another worker is added or substituted, there is confusion about the voice signals, or a voice signal is to be changed.

Labor. Part1926:Safety and health regulations for construction. Section1926.1421:Signals—voice signals—ad-ditional requirements.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

Hand signal charts must be either posted on the equipment or conspicu-ously posted in the vicinity of the hoisting operations.

Labor. Part1926:Safety and health regulations for construction. Section1926.1422:Signals—hand signal chart.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) Application. (1) Paragraphs (b), (c)(3), (e) and (f) of this section apply to all equipment covered by this subpart except tower cranes.

Labor. Part1926:Safety and health regulations for construction. Section1926.1423:Fall protection.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) Swing radius hazards. (1) The re-quirements in paragraph (a)(2) of this section apply where there are acces-sible areas in which the equipment's rotating superstructure (whether per-manently or temporarily mounted) poses a reasonably foreseeable risk of:

Labor. Part1926:Safety and health regulations for construction. Section1926.1424:Work area control.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) Where available, hoisting routes that minimize the exposure of employ-ees to hoisted loads must be used, to the extent consistent with public safe-ty.

Labor. Part1926:Safety and health regulations for construction. Section1926.1425:Keeping clear of the load.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) Boom free fall prohibitions. (1) The use of equipment in which the boom is designed to free fall (live boom) is pro-hibited in each of the following cir-cumstances:

Labor. Part1926:Safety and health regulations for construction. Section1926.1426:Free fall and controlled load lowering.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) The employer must ensure that, prior to operating any equipment cov-ered under subpart CC, the person is operating the equipment during a training period in accordance with paragraph (f) of this section, or the op-erator is qualified or certified to oper-ate the equipment in accordance with the following:

Labor. Part1926:Safety and health regulations for construction. Section1926.1427:Operator qualification and certification.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) The employer of the signal person must ensure that each signal person meets the Qualification Requirements (paragraph (c) of this section) prior to giving any signals. This requirement must be met by using either Option (1) or Option (2) of this section.

Labor. Part1926:Safety and health regulations for construction. Section1926.1428:Signal person qualifications.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) Maintenance, inspection and re-pair personnel are permitted to operate the equipment only where all of the following requirements are met:

Labor. Part1926:Safety and health regulations for construction. Section1926.1429:Qualifications of maintenance & repair employees.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

The employer must provide training as follows:

Labor. Part1926:Safety and health regulations for construction. Section1926.1430:Training.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

The requirements of this section are supplemental to the other require-ments in this subpart and apply when one or more employees are hoisted.

Labor. Part1926:Safety and health regulations for construction. Section1926.1431:Hoisting personnel.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) Plan development. Before begin-ning a crane/derrick operation in which more than one crane/derrick will be supporting the load, the operation must be planned. The planning must meet the following requirements:

Labor. Part1926:Safety and health regulations for construction. Section1926.1432:Multiple-crane/derrick lifts—supplemental requirements.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

The following requirements apply to equipment that has a manufacturer- rated hoisting/lifting capacity of more than 2,000 pounds.

Labor. Part1926:Safety and health regulations for construction. Section1926.1433:Design, construction and testing.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) Modifications or additions which affect the capacity or safe operation of the equipment are prohibited except where the requirements of paragraphs (a)(1), (a)(2), (a)(3), (a)(4), or (a)(5) of this section are met.

Labor. Part1926:Safety and health regulations for construction. Section1926.1434:Equipment modifications.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) This section contains supple-mental requirements for tower cranes; all sections of this subpart apply to tower cranes unless specified other-wise.

Labor. Part1926:Safety and health regulations for construction. Section1926.1435:Tower cranes.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11

(a) This section contains supple-mental requirements for derricks, whether temporarily or permanently mounted; all sections of this subpart apply to derricks unless specified oth-erwise. A derrick is powered equipment consisting of a mast or equivalent member that is held at or near the end by guys or braces, with or without a boom, and its hoisting mechanism. The mast/equivalent member and/or the load is moved by the hoisting mecha-nism (typically base-mounted) and op-erating ropes. Derricks include: A- frame, basket, breast, Chicago boom, gin pole (except gin poles used for erec-tion of communication towers), guy, shearleg, stiffleg, and variations of such equipment.

Labor. Part1926:Safety and health regulations for construction. Section1926.1436:Derricks.

ICS
CCS
C00
发布
2014-04-11
实施
2014-04-11



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号