本部分规定了核电厂建设项目工程量清单编制和计价基本要求、专业工程清单项目设置和计量规则等。执行本标准其他部分的具体规定时应遵守本部分的要求。本标准适用于国内建设的二代改进型商用压水堆核电厂的核岛、常规岛及与生产直接相关的BOP工程。其他核电厂建设项目可参照使用。本部分适用于核电厂建设建筑安装工程发承包及其实施阶段的工程量清单计价活动。

Code of valuation on bill of quantities of nuclear power plant construction works.Part 1: General rules

ICS
01.040.27
CCS
F02
发布
2014-06-29
实施
2014-11-01

A person must make a tariff or rate filing in order to establish or change any specific rate, rate schedule, tariff, tariff schedule, fare, charge, or term or condition of service, or any classification, contract, practice, or any related regulation established by and for the applicant.

Conservation of power and water resources. Part385:Rules of practice and procedure. SubpartB:Pleadings, tariff and rate filings, notices of tariff or rate examination, orders to show cause, intervention, and summary disposition. Section380.15:Tariff or ra

ICS
CCS
F02
发布
2014-05-21
实施
2014-05-21

General rule. All filings made in proceedings initiated under this part must be made electronically, including tariffs, rate schedules, service agreements, and contracts, or parts thereof, and material that relates to or bears upon such documents, such as cancellations, amendments, withdrawals, termination, or adoption of tariffs, and motions relating to suspension.

Conservation of power and water resources. Part154:Rate schedules and tariffs. SubpartA:General provisions and conditions. Section154.4:Electronic filing of tariffs and related materials.

ICS
CCS
F02
发布
2014-05-21
实施
2014-05-21

General rule. All filings made in proceedings initiated under this part must be made electronically, including tariffs, rate schedules and service agreements, or parts thereof, and material that relates to or bears upon such documents, such as cancellations, amendments, withdrawals, termination, or adoption of tariffs.

Conservation of power and water resources. Part35:Filing of rate schedules and tariffs. SubpartA:Application. Section35.7:Electronic filing of tariffs and related materials.

ICS
CCS
F02
发布
2014-05-21
实施
2014-05-21

(a) Unless otherwise stated in paragraphs (b), (c), (d), or (e) of this section, the content of any disclosures required by this part must be determined in accordance with the testing and sampling provisions required by the Department of Energy as set forth in subpart B to 10 CFR part 430, part 431, and 10 CFR 429.11.

Commercial Practices. Part305:Energy and water use labeling for consumer products under the energy policy and conservation act ("energy labeling rule"). Section305.5:Determinations of estimated annual energy consumption, estimated annual operating cost, a

ICS
CCS
F02
发布
2014-04-09
实施
2014-04-09

本标准规定了聚乙烯单位产品能源消耗限额的术语和定义、能耗限额、统计方法、计算方法、节能管理与措施。 本标准适用于以乙烯为原料合成生产聚乙烯产品的装置综合能耗的计算、评价和控制。适用于广东省行政区域内现有和新建的聚乙烯生产装置。

Energy consumption quota per unit product of polyethylene

ICS
27.010
CCS
F02
发布
2014-01-28
实施
2014-05-01

本标准规定了聚丙烯单位产品能源消耗限额的术语和定义、能耗限额、统计方法、计算方法、节能管理与措施。 本标准适用于以丙烯为原料合成生产聚丙烯产品的装置综合能耗的计算、评价和控制。适用于广东省行政区域内现有和新建的聚丙烯生产装置。

Energy consumption quota per unit product of polypropylene

ICS
27.010
CCS
F02
发布
2014-01-28
实施
2014-05-01

Any activity authorized under a blanket certificate issued under this subpart is subject to the following conditions: (a) Revisions. (1) The Commission reserves the right to amend the requirements of this subpart from time to time

Conservation of power and water resources. Part157:Applications for certificates of public convenience and necessity nd for orders permitting and approving abandonment under section 7 of the natural gas act. SubpartF:Interstate pipeline blanket certificat

ICS
CCS
F02
发布
2014
实施
2014

Except as provided in paragraph (b) of this section, the fee established for filing a petition for issuance of a declaratory order under § 385.207 of this chapter is $24,260. The fee must be submitted in accordance with subpart A of this part.

Conservation of power and water resources. Part381:Fees. SubpartC:Fees applicable to general activities. Section381.302:Petition for issuance of a declaratory order (except under Part I of the Federal Power Act.).

ICS
CCS
F02
发布
2014
实施
2014

Western’s resource acquisition activities will be determined by projectspecific power marketing plans, hydropower production capability, and the application of the following principles of IRP:

Energy. Part905:Energy planning and management program. SubpartE:Final Principles of integrated resource planning for western resource acquisition. Section950.50:Resource acquisition principles.

ICS
CCS
F02
发布
2014
实施
2014

Energy Efficiency and Savings Calculation, Top-down and Bottom-up Methods

ICS
27.010
CCS
F02
发布
2012-09-30
实施
2012-09-30

本标准规定了电力行业的发电、输电、供电、建设、规划设计、科研、高校等单位的单位类别分类代码。 本标准适用于电力行业单位的信息处理与交换、统计。

Electric power industry sectors classification and code

ICS
03.100.01
CCS
F02
发布
2012-01-04
实施
2012-03-01

本标准规定了核电厂建设项目经济评价的方法与参数。 本标准适用于压水堆核电厂建设项目经济评价,其它核动力建设项目可参照执行。

The economic evaluation guidelines of the nuclear power plant construction project

ICS
01.040.27
CCS
F02
发布
2011-07-01
实施
2011-10-01

Sinter waste heat recovery power generation technical specification

ICS
27
CCS
F02
发布
2011-04-28
实施
2011-06-01

Guidelines for Implementation of Energy Management System in Iron and Steel Enterprises

ICS
01.040.27
CCS
F02
发布
2011-04-28
实施
2011-06-01

Water Balance Test Method

ICS
CCS
F02
发布
2011/02/21
实施
2011/05/01

This European Standard specifies the definitions and minimum requirements for an energy efficiency service.

Energy efficiency services - Definitions and requirements; German version EN 15900:2010

ICS
01.040.03;01.040.91;03.080.10;91.120.10
CCS
F02
发布
2010-10
实施

本标准规定了核电厂建设项目工程其他费用的项目组成和计算标准。 本标准适用于新建或扩建600MW级、1000MW级压水堆商用核电厂建设项目,其他规模和堆型的核电工程可结合实际情况参照使用。

Regulation for indirect cost of nuclear power plant construction project

ICS
01.040.27
CCS
F02
发布
2010-05-01
实施
2010-10-01

本标准规定了核电厂建设项目建设预算编制方法。 本标准适用于各种投资渠道投资建设的新建、扩建压水堆核电厂工程建设预算的编制,其他堆型核电厂工程可参照使用。

Methodology for cost estimation of nuclear power plant construction project

ICS
01.040.27
CCS
F02
发布
2010-05-01
实施
2010-10-01

本标准规定了核电厂建设项目估算、概算和预算的项目及费用性质划分。 本标准适用于单机容量300MW级、600MW级、1000MW级压水堆核电厂建设项目初步可行性研究和可行性研究投资估算、初步设计概算、施工图预算和核电厂建设项目工程量清单报价,也是编制核电厂建设项目的招标标底、投标报价和竣工结算的编制依据,同时也是调解处理工程建设经济纠纷、鉴定投标报价的基础。

Guidelines for cost category and cost account of nuclear power plant construction project

ICS
01.040.27
CCS
F02
发布
2010-05-01
实施
2010-10-01



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号