K55 水轮机及其辅助设备 标准查询与下载



共找到 247 条与 水轮机及其辅助设备 相关的标准,共 17

Marine energy - Wave, tidal and other water current converters - Part 100: Power performance assessment of electricity producing wave energy converters

ICS
07.060;27.140
CCS
K55
发布
2012-08
实施

IEC/TS 62600-101, Ed. 1: Marine energy - Wave, tidal and other water current converters - Part 101: Wave energy resource assessment and characterization

ICS
07.060;27.140;27.190
CCS
K55
发布
2012-07
实施

Guide to specification of hydraulic turbine governing systems

ICS
27.140
CCS
K55
发布
2012-04-01
实施

本标准规定了水轮发电机推力轴承弹性金属塑料推力轴瓦的使用条件、技术性能、制造质量、安装与使用、试验、验收、供货范围、售后服务、包装运输储存及制造厂保证。 本标准适用于立式水轮发电机的推力轴承。 立式发电电动机的推力轴承、卧式水轮发电机的推力轴承及水轮发电机组的导轴承可参照本标准执行。 其他具有类似运行工况和使用条件的旋转机械的推力轴承、导轴承也可参照本标准执行。

Technical specification of elastic metal-plastic segment for thrust bearing of vertical-shaft hydrogenerators

ICS
27.140
CCS
K55
发布
2012-01-04
实施
2012-03-01

本导则适用于材质为马氏体型不锈钢混流式转轮在现场的整体制造,其他现场制造的转轮可参照执行。

Manufacturing process guide for the field assembly of francis turbine runner

ICS
27.140
CCS
K55
发布
2012-01-04
实施
2012-03-01

本标准规定了水电站水轮机、水泵水轮机金属蜗壳现场制造、安装、焊接及检验的技术要求、基本工艺方法和施工程序。 本标准适用于以低碳钢、低合金钢、高强度结构钢等为基本材料的水电站水轮机、水泵水轮机金属蜗壳。

Technological guide for manufactuing assembling and welding of metal spiral case of turbine in site

ICS
27.140
CCS
K55
发布
2012-01-04
实施
2012-03-01

IEC/TS 62600-100, Ed. 1: Marine energy - Wave, tidal and other water current converters - Part 100: Power performance assessment of electricity producing wave energy converters

ICS
07.060;27.140;27.190
CCS
K55
发布
2012-01
实施

Hydraulic machines, radial and axial. Performance conversion method from model to prototype

ICS
27.140
CCS
K55
发布
2012
实施
2014-01-01

Marine energy - Wave, tidal and other water current converters - Part 1: Terminology

ICS
01.040.27;27.140;27.190
CCS
K55
发布
2011-12-01
实施

IEC/TS 62600-200, Ed. 1: Marine energy - Wave, tidal and other water current converters - Part 200: Power performance assessment of electricty producing tidal energy converters

ICS
29.160.20
CCS
K55
发布
2011-11
实施

This European Standard specifies the safety requirements for RIC engine driven generating sets up to 1000 V consisting of a RIC engine, an alternating current (a.c.) generator including the additional equipment required for operating e. g., controlgear, switchgear and auxiliary equipment. This European Standard is not applicable for generating sets which are manufactured before the date of its publication as EN. It applies to generating sets for land and marine use, excluding generating sets used on board of seagoing vessels and mobile offshore units as well as on aircraft or to propel road vehicles and locomotives. The special requirements needed to cover operation in potentially explosive atmospheres are not covered in this standard. The hazards relevant to RIC engine driven generating sets are identified in Annex A.

Reciprocating internal combustion engine driven generating sets - Safety; German version EN 12601:2010

ICS
27.020;29.160.40
CCS
K55
发布
2011-07
实施

This International Standard defines the test, the measuring methods and the contractual guarantee conditions for field acceptance tests of the generating machinery in small hydroelectric power installations. It applies to installations containing impulse or reaction turbines with unit power up to about 15 MW and reference diameter of about 3 m. The driven generator can be of synchronous or asynchronous type. This International Standard contains information about most of the tests required for acceptance of the hydraulic turbine such as safety approval tests, trial operating and reliability tests, as well for verification of cavitation, noise and vibration conditions, if required. This standard represents the typical methods used on smaller hydroelectric installations, and is divided into three classes as follows (see Table 1 for more detail): Class A Normal test program (panel measurement) To determine the maximum power output of the installation. Default Class B Extended test program To determine the performance characteristics of the installation. Recommended Class C Comprehensive test program To determine the absolute efficiency of the installation. Optional NOTE All classes contain safety tests, trial operating tests, and reliability tests. This standard gives all necessary references for the contract in order to execute the test, evaluate, calculate and compare the result to the guarantee for all the classes A, B and C. The manufacturer or consulting engineer is responsible for ensuring that standardized connections are installed for performing these tests. This standard does not cover the structural details of a hydroelectric installation or its component parts.

Hydraulic machines. Acceptance tests of small hydroelectric installations

ICS
27.140
CCS
K55
发布
2011-06-30
实施
2011-06-30

IEC/TS 62600-100, Ed. 1.0: Marine energy - Wave, tidal and other water current converters - Part 100: Power performance assessment of electricity producing wave energy converters

ICS
07.060;27.140;27.190
CCS
K55
发布
2011-03
实施

This guide is intended to complement IEEE Std 125TM-1988, providing application details and addressing the impact of plant and system features on hydroelectric unit governing performance. It provides guidance for the design and application of hydroelectric turbine governing systems.

Guide for the Application of Turbine Governing Systems for Hydroelectric Generating Units

ICS
27.140
CCS
K55
发布
2011-01-01
实施

IEEE Guide for Control of Small (100 kVA to 5 MVA) Hydroelectric Power Plants

ICS
27.140
CCS
K55
发布
2011-01-01
实施

This document applies to all sizes and types of hydraulic turbines or pump-turbines. It defines methods for ascertaining performance by measuring flow rate (discharge), head, and power, from which efficiency may be determined. Requirements are included for pretest arrangements, types of instrumentation, methods of measurement, testing procedures, methods of calculation, and contents of test reports. This Code also contains recommended procedures for index testing and describes the purposes for which index tests may be used.

Hydraulic Turbines and Pump-Turbines

ICS
27.140
CCS
K55
发布
2011
实施
2011-6-10

Hydraulic Turbines and Pump - Turbines

ICS
27.140
CCS
K55
发布
2011
实施

Recommended Practice for Unique Identification in Hydroelectric Facilities

ICS
27.140
CCS
K55
发布
2011
实施

This International Standard defines the test, the measuring methods and the contractual guarantee conditions for field acceptance tests of the generating machinery in small hydroelectric power installations. It applies to installations containing impulse or reaction turbines with unit power up to about 15 MW and reference diameter of about 3 m. The driven generator can be of synchronous or asynchronous type. This International Standard contains information about most of the tests required for acceptance of the hydraulic turbine such as safety approval tests, trial operating and reliability tests, as well for verification of cavitation, noise and vibration conditions, if required. This standard represents the typical methods used on smaller hydroelectric installations, and is divided into three classes as follows (see Table 1 for more detail): Class A Normal test program (panel measurement) To determine the maximum power output of the installation. Default Class B Extended test program To determine the performance characteristics of the installation. Recommended Class C Comprehensive test program To determine the absolute efficiency of the installation. Optional NOTE All classes contain safety tests, trial operating tests, and reliability tests. This standard gives all necessary references for the contract in order to execute the test, evaluate, calculate and compare the result to the guarantee for all the classes A, B and C. The manufacturer or consulting engineer is responsible for ensuring that standardized connections are installed for performing these tests. This standard does not cover the structural details of a hydroelectric installation or its component parts.

Hydraulic machines - Acceptance tests of small hydroelectric installations

ICS
27.140
CCS
K55
发布
2010-10
实施
2010-10

This International Standard is applicable to the assessment of the efficiency and performance of prototype hydraulic machine from model test results, with consideration of scale effect including the effect of surface roughness. This standard is intended to be used for the assessment of the results of contractual model tests of hydraulic machines.

Hydraulic machines, radial and axial - Performance conversion method from model to prototype

ICS
27.140
CCS
K55
发布
2009-07-31
实施
2009-07-31



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved