IEC 61158-6-7:2007
工业通讯网络.数据总线规范.第6-7部分:应用层协议规范.7型元件

Industrial communication networks - Fieldbus specifications - Part 6-7: Application layer protocol specification - Type 7 elements


IEC 61158-6-7:2007




购买全文,请联系:


标准号
IEC 61158-6-7:2007
发布日期
2007年12月
实施日期
废止日期
中国标准分类号
N18;P76
国际标准分类号
25.040.40;35.100.70;35.160
发布单位
国际电工委员会
引用标准
IEC 60559 IEC 61158-3-7 IEC 61158-4-7 IEC 61158-5-7 ISO/IEC 7498-1 ISO/IEC 7498-18825 ISO/IEC 8824 ISO/IEC 9506-2 ISO/IEC 9545
被代替标准
IEC 65C/476/FDIS:2007 IEC 61158-6:2003
适用范围
1.1 General The fieldbus application layer (FAL) provides user programs with a means to access the fieldbus communication environment. In this respect, the FAL can be viewed as a “window between corresponding application programs.” This standard provides common elements for basic time-critical and non-time-critical messaging communications between application programs in an automation environment and material specific to Type 7 fieldbus. The term “time-critical” is used to represent the presence of a time-window, within which one or more specified actions are required to be completed with some defined level of certainty. Failure to complete specified actions within the time window risks failure of the applications requesting the actions, with attendant risk to equipment, plant and possibly human life. 1.2 Specifications The principal objective of this standard is to specify the syntax and behavior of the application layer protocol that conveys the application layer services defined in IEC 61158-5-7. A secondary objective is to provide migration paths from previously-existing industrial communications protocols. It is this latter objective which gives rise to the diversity of protocols standardized in parts of the IEC 61158-6 series. 1.3 Conformance This standard does not specify individual implementations or products, nor does it constrain the implementations of application layer entities within industrial automation systems.There is no conformance of equipment to the application layer service definition standard. Instead, conformance is achieved through implementation of this application layer protocol specification.

IEC 61158-6-7:2007相似标准


推荐

九大现场总线,你知道几个?会用几个?

它采用了OSI模型的物理层、数据链路层,由这两部分形成了其标准第一部分的子集,DP隐去了3~7层,而增加了直接数据连接拟合作为用户接口,FMS只隐去3~6层,采用了应用层,作为标准的第二部分。PA的标准目前还处于制定过程之中,其传输技术遵从IEC1158-2(1)标准,可实现总线供电与本质安全防爆。四、CAN总线控制器局域网(CAN)最早由Bosch公司于1985年研发,用于搭建车内网络。...

9大现场总线全解析,赶紧收藏!

它采用了OSI模型的物理层、数据链路层,由这两部分形成了其标准第一部分的子集,DP隐去了3~7层,而增加了直接数据连接拟合作为用户接口,FMS只隐去3~6层,采用了应用层,作为标准的第二部分。PA的标准目前还处于制定过程之中,其传输技术遵从IEC1158-2(1)标准,可实现总线供电与本质安全防爆。四、CAN总线控制器局域网(CAN)最早由Bosch公司于1985年研发,用于搭建车内网络。...

139项国家标准4月起实施 28项涉仪器仪表

EtherCAT 3部分:数据链路层服务定义2015-04-0185GB/T 31230.4-2014工业以太网现场总线EtherCAT 4部分:数据链路层协议规范2015-04-0186GB/T 31230.5-2014工业以太网现场总线EtherCAT 5部分:应用层服务定义2015-04-0187GB/T 31230.6-2014工业以太网现场总线EtherCAT 6部分:应用层协议规范...

九大最流行现场总线“叱咤”工控领域

它采用了OSI模型的物理层、数据链路层,由这两部分形成了其标准第一部分的子集,DP隐去了3~7层,而增加了直接数据连接拟合作为用户接口,FMS只隐去3~6层,采用了应用层,作为标准的第二部分。PA的标准目前还处于制定过程之中,其传输技术遵从IEC1158-2(1)标准,可实现总线供电与本质安全防爆。Porfibus支持主—从系统、纯主站系统、多主多从混合系统等几种传输方式。...


谁引用了IEC 61158-6-7:2007 更多引用





Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号