GB/T 16507.5-2013
Water-tube Boilers.Part 5:Fabrication

2023-02
Standard No.
GB/T 16507.5-2013
Language
Chinese
Release Date
2013
Published By
General Administration of Quality Supervision, Inspection and Quarantine of the People‘s Republic of China
Replace By
GB/T 16507.5-2022
Lastest
GB/T 16507.5-2022
Replace
GB/T 16507-1996
Scope
This part of GB/T 16507 specifies the requirements for marking, cold and hot forming, expansion joints, welding and heat treatment of water tube boilers during the manufacturing process. This section applies to the manufacture of water tube boilers defined in the scope of GB/T 16507.1.

GB/T 16507.5-2013 Referenced Document

  • GB/T 16507.1 Water-tube boilers—Part 1: General requirements*2022-03-09 Update
  • GB/T 16507.2 Water-tube boilers—Part 2: Materials*2022-03-09 Update
  • GB/T 16507.3 Water-tube boilers—Part 3: Structure design*2022-03-09 Update
  • GB/T 16507.4 Water-tube boilers—Part 4: Strength calculation of pressure parts*2022-03-09 Update
  • GB/T 16507.6 Water-tube boilers—Part 6: Inspection, testing and acceptance*2022-03-09 Update
  • GB/T 2652 Destructive tests on welds in metallic materials—Longitudinal tensile test on weld metal in fusion welded joints*2022-10-12 Update
  • GB/T 985.1 Recommended joint preparation for gas welding,manual metal arc welding,gas-shield arc welding and beam welding
  • GB/T 985.2 Recommended joint preparation for submerged arc welding
  • JB/T 3223 Rules of quality management of welding materials*2017-11-07 Update
  • JB/T 9626 Specification for boiler forging
  • NB/T 47014 Welding procedure qualification for pressure equipment
  • NB/T 47016 Mechanical property tests of product welded test coupons for pressure equipments

GB/T 16507.5-2013 history


GB/T 16507.5-2013 -All Parts