GB/T 1094.3-2017
Power transformers - Part 3: Insulation levels, insulation tests and outer insulation air gaps
Home
Std.
GB/T 1094.3-2017
Standard No.
GB/T 1094.3-2017
Language
Chinese
Release Date
2018
Published By
General Administration of Quality Supervision, Inspection and Quarantine of the People‘s Republic of China
Latest
GB/T 1094.3-2017
Replace
GB/T 1094.3-2003
GB/T 1094.3-2017 history
2018
GB/T 1094.3-2017
Power transformers - Part 3: Insulation levels, insulation tests and outer insulation air gaps
2013
GB 1094.1-2013
Power transformers.Part 1: General
1996
GB 1094.1-1996
Power transformers. Part 1: General
1985
GB 1094.1-1985
Power transformers--Part 1: General
0000年
GB 1094-1979
GB/T 1094.3-2017 -All Parts
GB/T 1094.1-2013 Power transformers―Part 1: General
GB/T 1094.10-2022 Power transformers— Part 10:Determination of sound levels
GB/T 1094.101-2023 Power Transformers Part 101: Guidelines for the Application of Sound Level Determination
GB/T 1094.11-2022 Power transformers—Part 11: Dry-type transformers
GB/T 1094.12-2013 Power transformers.Part 12: Loading guide for dry-type power transformers
GB/T 1094.14-2022 Power transformers—Part 14: Liquid-immersed power transformer using high-temperature insulation materials
GB/T 1094.15-2020 Power transformers—Part 15:Gas-filled power transformers
GB/T 1094.16-2013 Power transformers—Part 16: Transformers for wind turbine applications
GB/T 1094.18-2016 Power transformers—Part 18: Measurement of frequency response
GB/T 1094.2-2013 Power transformers―Part 2: Temperature rise for liquid-immersed transformers
GB/T 1094.23-2019 Power transformers—Part 23: DC magnetic bias suppression devices
GB/T 1094.3-2017 Power transformers - Part 3: Insulation levels, insulation tests and outer insulation air gaps
GB/T 1094.4-2005 Power transformers.Part 4:Guide to the lightning impulse and switching impulse testing.Power transformers and reactors
GB/T 1094.5-2008 Power transformers - Part 5: Ability to withstand short circuit
GB/T 1094.6-2011 Power Transformers Part 6: Reactors
GB/T 1094.7-2008 Power transformers.Part 7: Loading guide for oil-immersed power transformers
Copyright ©2007-2023 ANTPEDIA, All Rights Reserved