F00 标准化、质量管理 标准查询与下载



共找到 343 条与 标准化、质量管理 相关的标准,共 23

(a) Discrimination by a Commission licensee, an applicant for a Commission license, or a contractor or subcontractor of a Commission licensee or applicant against an employee for engaging in certain protected activities is prohibited. Discrimination includes discharge and other actions that relate to compensation, terms, conditions, or privileges of employment. The protected activities are established in section 211 of the Energy Reorganization Act of 1974, as amended, and in general are related to the administration or enforcement of a requirement imposed under the Atomic Energy Act or the Energy Reorganization Act.

Energy. Part60:Disposal of highlevel radioactive wastes in geologic repositories. Subpart A:General Provisions. Section60.9:Employee protection.

ICS
CCS
F00
发布
2014-11-10
实施
2014-11-10

(a) Each licensee (except for a holder of an early site permit under subpart A of part 52 of this chapter, or a holder of a manufacturing license under subpart F of part 52 of this chapter) shall post current copies of the following documents:

Energy. Part19:Notices, instructions and reports to workers: inspection and investigations. Section19.11:Posting of notices to workers.

ICS
CCS
F00
发布
2014-11-10
实施
2014-11-10

(a) Each operator license and senior operator license expires six years after the date of issuance, upon termination of employment with the facility licensee, or upon determination by the facility licensee that the licensed individual no longer needs to maintain a license.

Energy. Part55:Operators’ licenses. Subpart F:Licenses. Section55.55:Expiration.

ICS
CCS
F00
发布
2014-11-10
实施
2014-11-10

(a) Discrimination by a Commission licensee, certificate holder, an applicant for a Commission license or a CoC, or a contractor or subcontractor of any of these, against an employee for engaging in certain protected activities, is prohibited. Discrimination includes discharge and other actions that relate to compensation, terms, conditions, or privileges of employment. The protected activities are established in section 211 of the Energy Reorganization Act of 1974, as amended, and in general are related to the administration or enforcement of a requirement imposed under the Atomic Energy Act or the Energy Reorganization Act.

Energy. Part72:Licensing requirements for the independent storage of spent nuclear fuel, high-level radioactive waste, and reactor-related greater than class c waste. Subpart A:General Provisions. Section72.10:Employee protection.

ICS
CCS
F00
发布
2014-11-10
实施
2014-11-10

Each license contains and is subject to the following conditions whether stated in the license or not:

Energy. Part55:Operators’ licenses. Subpart F:Licenses. Section55.53:Conditions of licenses.

ICS
CCS
F00
发布
2014-11-10
实施
2014-11-10

(a) Discrimination by a Commission licensee, an applicant for a Commission license, or a contractor or subcontractor of a Commission licensee or applicant, against an employee, for engaging in certain protected activities, is prohibited. Discrimination includes discharge and other actions that relate to compensation, terms, conditions, or privileges of employment. The protected activities are established in section 211 of the Energy Reorganization Act of 1974, as amended, and in general are related to the administration or enforcement of a requirement imposed under the Atomic Energy Act or the Energy Reorganization Act.

Energy. Part63:Disposal of highlevel radioactive wastes in a geologic repository at yucca mountain, nevada. Subpart A:General Provisions. Section63.9:Employee protection.

ICS
CCS
F00
发布
2014-11-10
实施
2014-11-10

(a) Where practicable, the presiding officer will render a decision from the bench. In rendering a decision from the bench, the presiding officer shall state the issues in the proceeding and make clear its findings of fact and conclusions of law on each issue. The presiding officer’s decision and order must be reduced to writing and transmitted to the parties as soon as practicable, but not later than twenty (20) days, after the hearing ends. If a decision is not rendered from the bench, a written decision and order will be issued not later than thirty (30) days after the hearing ends. Approval of the Chief Administrative Judge must be obtained for an extension of these time periods, and in no event may a written decision and order be issued later than sixty (60) days after the hearing ends without the express approval of the Commission.

Energy. Part2:Agency rules of practice and procedure. Subpart N:Expedited Proceedings with Oral Hearings.Section2.1406:Initial decision—issuance and effectiveness.

ICS
CCS
F00
发布
2014-11-10
实施
2014-11-10

(a) Discrimination by a Commission licensee, certificate holder, an applicant for a Commission license or a CoC, or a contractor or subcontractor of any of these, against an employee for engaging in certain protected activities, is prohibited. Discrimination includes discharge and other actions that relate to compensation, terms, conditions, or privileges of employment. The protected activities are established in section 211 of the Energy Reorganization Act of 1974, as amended, and in general are related to the administration or enforcement of a requirement imposed under the Atomic Energy Act of 1954, as amended, or the Energy Reorganization Act of 1974, as amended.

Energy. Part71:Packaging and transportation of radioactive material. Subpart A:General Provisions. Section71.9:Employee protection.

ICS
CCS
F00
发布
2014-11-10
实施
2014-11-10

Each construction permit for a utilization facility is subject to the following terms and conditions and the applicable requirements of §50.55a; each construction permit for a production facility is subject to the following terms and conditions with the exception of paragraph (i); each early site permit is subject to the terms and conditions in paragraph (f) of this section; each manufacturing license is subject to the terms and conditions in paragraphs (e), (f), and (i) of this section and the applicable requirements of §50.55a; and each combined license is subject to the terms and conditions in paragraphs (e), (f), and (i) of this section and the applicable requirements of §50.55a until the date that the Commission makes the finding under §52.103(g) of this chapter:

Energy. Part50:Domestic licensing of production and utilization facilities. Section50.55:Conditions of construction permits, early site permits, combined licenses, and manufacturing licenses.

ICS
CCS
F00
发布
2014-11-05
实施
2014-11-05

Any permittee may file an application for amendment of its permit, including any extension of the term of the permit that would not cause the total term to exceed five years. (Transfer of a permit is prohibited by section 5 of the Federal Power Act.) Each application for amendment of a permit must conform to any relevant requirements of §4.81 (b), (c), and (d).

Conservation of power and water resources. Part4:Licenses, permits, exemption ,and determination of project costs. SubpartI:Application for preliminary permit; amendment and cancellation of preliminary permit. Section4.82:Amendments.

ICS
CCS
F00
发布
2014-10-01
实施
2014-10-01

Each original map or drawing must consist of a print on silver or gelatin 35mm microfilm mounted on Type D (31?4″ by 73?8″) aperture cards. Full-sized prints of maps and drawings must be on sheets no smaller than 22 by 34 inches and no larger than 24 by 36 inches. A space five inches high by seven inches wide must be provided in the lower right hand corner of each sheet. The upper half of this space must bear the title, numerical and graphical scale, and other pertinent information concerning the map or drawing. The lower half of the space must be left clear. Exhibit G drawings must be stamped by a registered land surveyor.

Conservation of power and water resources. Part4:Licenses, permits, exemption ,and determination of project costs. Subpart D:Application for preliminary permit, license or exemption: general provisions. Section4.39:Specifications for maps and drawings.

ICS
CCS
F00
发布
2014-10-01
实施
2014-10-01

Application for a preliminary permit or a license. Any citizen, association of citizens, domestic corporation, municipality, or state may submit for filing an initial application or a competing application for a preliminary permit or a license for a water power project under Part I of the Federal Power Act.

Conservation of power and water resources. Part4:Licenses, permits, exemption ,and determination of project costs. Subpart D:Application for preliminary permit, license or exemption: general provisions. Section4.31:Initial or competing application: who ma

ICS
CCS
F00
发布
2014-10-01
实施
2014-10-01

Trial-type hearing. The Commission may order a trial-type hearing on an application for a preliminary permit, a license, or an exemption from licensing upon either its own motion or the motion of any interested party of record. Any trial-type hearing will be limited to the issues prescribed by order of the Commission. In all other cases the hearings will be conducted by notice and comment procedures.

Conservation of power and water resources. Part4:Licenses, permits, exemption ,and determination of project costs. Subpart D:Application for preliminary permit, license or exemption: general provisions. Section4.32:Hearings on applications; consultation o

ICS
CCS
F00
发布
2014-10-01
实施
2014-10-01

Requirement to consult. (1) Before it files any application for an original license or an exemption from licensing that is described in paragraph (a)(6) of this section, a potential applicant must consult with the relevant Federal, State, and interstate resource agencies, including the National Marine Fisheries Service, the United States Fish and Wildlife Service, the National Park Service, the United States Environmental Protection Agency, the Federal agency administering any federal lands or facilities utilized or occupied by the project, the appropriate State fish and wildlife agencies, the appropriate State water resource management agencies, the certifying agency under section 401(a)(1) of the Federal Water Pollution Control Act (Clean Water Act), 33 U.S.C. §1341(c)(1), and any Indian tribe that may be affected by the proposed project.

Conservation of power and water resources. Part4:Licenses, permits, exemption ,and determination of project costs. Subpart D:Application for preliminary permit, license or exemption: general provisions. Section4.38:Consultation requirements.

ICS
CCS
F00
发布
2014-10-01
实施
2014-10-01

(a) Fingerprinting, and the identification and criminal history records checks required by section 149 of the Atomic Energy Act of 1954, as amended, and other elements of the background investigation are not required for the following individuals prior to granting unescorted access to category 1 or category 2 quantities of radioactive materials:

Energy. Part37:Physical protection of category 1 and category 2 quantities of radioactive material. Subpart B:Background Investigations and Access Control Program. Section37.29:Relief from fingerprinting, identification, and criminal history records check

ICS
CCS
F00
发布
2014-09-30
实施
2014-09-30

(a) Security plan. (1) Each licensee identified in §37.41(a) shall develop a written security plan specific to its facilities and operations. The purpose of the security plan is to establish the licensee’s overall security strategy to ensure the integrated and effective functioning of the security program required by this subpart. The security plan must, at a minimum:

Energy. Part37:Physical protection of category 1 and category 2 quantities of radioactive material. Subpart C:Physical Protection Requirements During Use. Section37.43:General security program requirements.

ICS
CCS
F00
发布
2014-09-30
实施
2014-09-30

(a) Reports to NRC Operations Center. (1) Each licensee shall report to the NRC Operations Center the events described in Appendix A to Part 70.

Energy. Part70:Domestic licensing of special nuclear material. Subpart H:Additional Requirements for Certain Licensees Authorized To Possess a Critical Mass of Special Nuclear Material. Section70.74:Additional reporting requirements.

ICS
CCS
F00
发布
2014-09-26
实施
2014-09-26

(a) Construction permit stage. Each applicant for a permit to construct a production or utilization facility covered by §51.20 shall submit with its application a separate document, entitled ‘‘Applicant’s Environmental Report— Construction Permit Stage,’’ which shall contain the information specified in §§51.45, 51.51, and 51.52. Each environmental report shall identify procedures for reporting and keeping records of environmental data, and any conditions and monitoring requirements for protecting the non-aquatic environment, proposed for possible inclusion in the license as environmental conditions in accordance with §50.36b of this chapter. As stated in §51.23, no discussion of the environmental impacts of the continued storage

Energy. Part51:Environmental protection regulations for domestic licensing and related regulatory functions. Subpart A:National Environmental Policy Act—Regulations Implementing Section 102(2). Section51.50:Environmental report-construction permit, early

ICS
CCS
F00
发布
2014-09-19
实施
2014-09-19

(a) The Commission has generically determined that the environmental impacts of continued storage of spent nuclear fuel beyond the licensed life for operation of a reactor are those impacts identified in NUREG–2157, ‘‘Generic Environmental Impact Statement for Continued Storage of Spent Nuclear Fuel.’’

Energy. Part51:Environmental protection regulations for domestic licensing and related regulatory functions. Subpart A:National Environmental Policy Act—Regulations Implementing Section 102(2). Section51.23:Environmental impacts of continued storage of sp

ICS
CCS
F00
发布
2014-09-19
实施
2014-09-19

(a) An environmental assessment for proposed actions, other than those for a standard design certification under 10 CFR part 52 or a manufacturing license under part 52, shall identify the proposed action and include:

Energy. Part51:Environmental protection regulations for domestic licensing and related regulatory functions. Subpart A:National Environmental Policy Act—Regulations Implementing Section 102(2). Section51.30:Environmental assessment.

ICS
CCS
F00
发布
2014-09-19
实施
2014-09-19



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号