K51 电站设备自动化装置 标准查询与下载



共找到 99 条与 电站设备自动化装置 相关的标准,共 7

Guide for procurement of power station equipment - Part 2-9: Electrical equipment - Cabling systems; German version EN 45510-2-9:2008

ICS
27.100;29.060.01
CCS
K51
发布
2009-04
实施
2009-04-01

This code provides the procedures, direction, and guidance for the accurate determination, via testing, of the maximum repeatable load change ramp rate, startup load change rate or shutdown load change rate of a power plant. It is applicable to all electrical generating facilities, independent of fuel source or prime movers. The load change rate is distinguished by starting from one operating point at steady state condition and transitioning to another. Startup commences at a shutdown condition, or intermediary startup condition, and proceeds to a defined running condition. Shutdown begins at a running condition and proceeds to a shutdown condition or intermediary shutdown condition. Measurements of actual net generation as a function of time are the primary test parameters. Additional data and information will be collected as part of this analysis to determine the long and short term effects of various ramp rates on the equipment and systems in the power plant of interest. This information includes and is not limited to design specifications and actual operating conditions. This Code is applicable to all electrical generating facilities, independent of fuel source or prime movers. This Code is directed at providing guidelines for measuring the machinery impact of controlled transients that are initiated by the operator. It is not the intent of this Code to address uncontrolled transients that may be initiated by system activity such as load rejection or governor response to grid frequency disturbances.

Ramp Rates

ICS
27.100
CCS
K51
发布
2009
实施

This Standard provides minimum requirements for the design and erection of high voltage installations in systems with nominal voltages above 1 kV a.c. and nominal frequency up to and including 60 Hz, so as to provide safety and proper functioning for the use intended. For the purposes of this Standard, a high voltage installation is considered to be: (a) An electricity network substation, under the control of an electricity network operator or entity authorized by a licence or other legal instrument to convey electricity. (b) The high voltage parts of an electrical installation of a power station including all auxiliary systems and interconnecting lines and cables between power stations if on the same site. (c) The high voltage parts of an electrical installation that are not covered in (a) and (b) above. This may include but not be limited to consumer and customer electrical installations serving premises such as factories, commercial facilities, industrial plants, institutional facilities and mine sites. This Standard does not apply to the design and erection of any of the following: (A) Overhead lines and underground cables between separate installations.

Substations and high voltage installations exceeding 1 kV a.c.

ICS
CCS
K51
发布
2008-12-12
实施

The scope of this International Standard covers turbines, storage pumps and pump-turbines of all sizes and of the following types: • Francis; • Kaplan; • propeller; • Pelton (turbines only); • Bulb. Wherever turbines or turbine components are referred to in the text of this guide, they shall be interpreted also to mean the comparable units or components of storage pumps or pumpturbines as the case requires. The Guide also identifies without detailed discussion, other powerhouse equipment that could affect or be affected by a turbine, storage pump, or pump-turbine rehabilitation. The object of this guide is to assist in identifying, evaluating and executing rehabilitation and performance improvement projects for hydraulic turbines, storage pumps and pump-turbines. This guide can be used by owners, consultants, and suppliers to define: • needs and economics for rehabilitation and performance improvement; • scope of work; • specifications; • evaluation of results. The Guide is intended to be: • an aid in the decision process; • an extensive source of information on rehabilitation; • an identification of the key milestones in the rehabilitation process; • an identification of the points that should be addressed in the decision processes. The Guide is not intended to be a detailed engineering manual nor a maintenance guide.

Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement

ICS
27.140
CCS
K51
发布
2008-08-29
实施
2008-08-29

Inspection Specifications of Measuring & Control Device In Monitoring Control System for Substation(Power Plant)

ICS
29.240.30
CCS
K51
发布
2006-12-28
实施
2007-03-30

本标准规定了大中型水轮发电机静止整流励磁系统及装置试验分类、试验项目、基本试验方法与要求。 本标准适用于单机容量为10MW及以上大中型水轮发电机(以下简称发电机)的静止整流励磁系统及装置的使用与订货要求。由于整流型励磁系统目前主要是以自并励方式的系统为主,其他方式实际 已很少使用。因此本标准主要针对自并励系统进行阐述。

Test regulation for static rectined excitation systems and devices for large and medium hydraulic generators

ICS
27.100
CCS
K51
发布
2006-09-14
实施
2007-03-01

本标准规定了大中型水轮发电机静止整流励磁系统及装置的基本技术要求、使用的术语、定义、计算方法、试验、技术文件等。 本标准适用于单机容量为1OMW及以上大中型水轮发电机(以下简称发电机)的静止整流励磁系统及装置的使用与订货要求。目前整流型励磁系统主要是以自并励方式的系统为主,其他方式实际已很少使用。因此本标准主要针对自并励系统进行阐述,整流型励磁系统亦可参照执行。

Specification for static rectified excitation systems and devices for large and medium hydraulic generators

ICS
27.100
CCS
K51
发布
2006-09-14
实施
2007-03-01

本标准规定了大中型水轮发电机微机励磁调节器的试验分类、试验项目、基本试验和调整方法与要求。 本标准适用于单机容量为10MW及以上大中型水轮发电机(简称发电机)的微机励磁调节器使用与试验调整要求。

Test and adjustment guide of microcomputer-based excitation regulator for large and medium hydraulic generators

ICS
27.100
CCS
K51
发布
2006-09-14
实施
2007-03-01

This guide is intended to aid the equipment manufacturer, installer, and turbine operator in coordinating their efforts to obtain and maintain clean lubrication and control systems. The flushing and cleaning philosophies stated in this guide are applicable to both large and small lubrication systems. Clean lubrication systems result from proper system design and good planning, execution, and communication by all involved during commissioning. No phase of these procedures should be undertaken without a thorough understanding of the possible effects of improper system preparation. The installation, cleaning, and flushing of the equipment should not be entrusted to persons lacking in experience. Because of the knowledge and specialized equipment that is required, the operator may wish to employ an outside specialist contractor for the system flushing. Review of this guide can provide guidelines for discussion with prospective contractors.1.1 This guide covers types of contaminants, oil purification devices, contamination monitoring, contamination control during building or refurbishing of turbine systems, lubrication system flushing, and maintenance of pure lubrication oil.1.2 To obtain maximum operating life and reliability, or lubricants and system, it is vital that the turbine lubrication system has pure oil. This guide is intended to aid the equipment manufacturer, installer, and turbine operator in coordinating their efforts to obtain and maintain clean lubrication and control systems. These systems may be on land or marine turbine generators and propulsion and mechanical drive equipment. This guide is generalized due to variations in the type of equipment, builder''s practices, and operating conditions.1.3 This guide primarily addresses petroleum based lubricating oil. For systems using nonpetroleum based fluids, this guide may not be appropriate. For nonpetroleum products, consult the equipment and fluid manufacturers.1.4 This guide is applicable to both large and small lubrication systems. Some equipment specified herein, however, may not be appropriate for all systems. Moreover, in situations where specific guidelines and procedures are provided by the equipment manufacturer, such procedures should take precedence over the recommendations of this guide.This standard does not purport to address the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

Standard Guide for Cleaning, Flushing, and Purification of Steam, Gas, and Hydroelectric Turbine Lubrication Systems

ICS
75.100 (Lubricants, industrial oils and related pr
CCS
K51
发布
2005
实施

1.1 This terminology covers terms and their definitions relevant to the use of protective coatings in nuclear power plants.

Standard Terminology Relating to Protective Coating and Lining Work for Power Generation Facilities

ICS
27.100 (Power stations in general)
CCS
K51
发布
2005
实施

本标准适用于单机容量为50~600MW、采用国产机组的新建和扩建的火力发电厂。对于单机容量在50MW以下或采用成套进口设备的电厂,其试验室面积和设备可参照使用本标准。 火力发电厂热工自动化试验室热工电测计量标准及其量值传递应遵守《中华人民共和国强制检定的工作计量器具检定管理办法》和《水利电力部门电测、热工计量仪表和装置检定管理的规定》。 火力发电厂热工自动化试验室的设计在满足电厂安全、经济运行的前提下,应力求精简节约,降低工程投资。

Design standard of I&C laboratory for fossil power plant

ICS
27.100
CCS
K51
发布
2004-03-09
实施
2004-06-01

Covers units substations of 1000 K VA single phase or 3000 k VA 3-phase maximum, having nominal primary or secondary rating of 600 Volts, for use on circuits having available short circuit currents of not more than 200, 000 amperes, rms symmetrical.Their construction, installation, and use are intended to be in accordance with ANSI/NFPA 70-1984, National Electrical Code.

Unit substations

ICS
29.180
CCS
K51
发布
2004-01-01
实施

IEEE Standards Interpretation for IEEE Std 980?-1994 IEEE Guide for Containment and Control of Oil Spills in Substations

IEEE Standards Interpretation for IEEE Std 980?-1994 IEEE Guide for Containment and Control of Oil Spills in Substations

ICS
CCS
K51
发布
2002-11-01
实施

本标准规定了电力系统稳定控制装置的产品分类、技术要求、试验方法、检验规则、标志和使用说明书及包装、运输和贮存等。 本标准适用于电力系统稳定控制装置,包括自动低频减载装置、自动低电压减载装置、振荡预测装置、自动解列装置、自动稳定控制装置及自动稳定控制装置用测量元件等。 本标准仅适用于新的装置。

Power system stability control device

ICS
29.240.30
CCS
K51
发布
2002-07-16
实施
2002-12-01

本标准规定了电气转速信号装置的产品分类、技术要求、试验方法、检验规则、标志、标签和使用说明书、包装、运输和贮存、供货的成套性及质量保证等。 本标准适用于电气转速信号装置。该类装置用于测量水轮发电机组转速变化,并发出相应信号。 本标准仅适用于新的装置。

Electrical rotating speed signal equipment

ICS
29.120.70
CCS
K51
发布
2002-07-16
实施
2002-12-01

本标准规定了由内燃机、发电机、控制装置、开关装置和辅助设备组成的发电机组或电站的基本名词术语。 内燃机电站的各类型标准所使用的名词术语应符合本标准规定。

Terminology for electric power plant with internal combustion engines

ICS
27.100
CCS
K51
发布
2001-08-30
实施
2002-02-01

Remote terminal unit of integrated totals

ICS
27.100
CCS
K51
发布
2001-02-12
实施
2001-07-01

Remote terminal unit of distribution automation system

ICS
29.240
CCS
K51
发布
2000-11-03
实施
2001-01-01

This standard gives guidance on writing the technical specification for the procurement of stationary batteries and chargers for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers stationary lead-acid and nickel-cadmium batteries, chargers, battery accommodation, battery main connections and battery accessories. This equipment usually forms part of either a centralized or unit d.c. supplies system for duties such as switchgear closing/tripping, protection, control, alarm, instrumentation and telecommunication supplies, emergency lighting and emergency drives. The equipment covered by this Guide is defined by its function rather than design type. Therefore, the guidance to the specification is stated in performance terms rather than being specified by a detailed description of the equipment to be supplied. This Guide indicates to potential purchasers how their specification should be prepared so that - the equipment type and capacity interfaces correctly with other elements of the systems, - predicted performance is achieved, - ancillary equipment is property sized, - reliability, availability and safety requirements are achieved, - proper consideration is given to the evaluation process and the quality measures to be applied. This Guide does not determine the type of specification (e.g. detailed, performance, functional) or the extent of supply for any given contract which is normally decided on the basis of the purchaser's project strategy. It does not cover - any commercial, contractual or legal issues which are normally in separate parts of an enquiry, - any allocation of responsibilities which are determined by the contract. This Guide does not prescribe the arrangement of the documents in the enquiry. NOTE: As a comprehensive European environmental policy is still under preparation, this Guide does not address the environmental implications of the equipment.

Guide for the procurement of power station equipment - Electrical equipment - Stationary batteries and chargers

ICS
27.100;29.200
CCS
K51
发布
2000-06-15
实施
2000-06-15

This standard gives guidance on writing the technical specification for the procurement of turbine-driven generators and their auxiliaries for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. The generators may be air, hydrogen, or liquid-cooled. The excitation system may be of the static or rotating rectifier type fed by a static or rotating power supply. The equipment covered by this Guide is defined by its function rather than design type. Therefore, the guidance to the specification is stated in performance terms rather than being specified by a detailed description of the equipment to be supplied. This Guide indicates to potential purchasers how their specification should be prepared so that - the equipment type and capacity interfaces correctly with other elements of the systems; - predicted performance is achieved' - ancillary equipment is properly sized, - reliability, availability and safety requirements are achieved, - proper consideration is given to the evaluation process and the quality measures to be applied. This Guide does not determine the type of specification (e.g. detailed, performance, functional) or the extent of supply for any given contract which is normally decided on the basis of the purchaser's project strategy. It does not cover - any commercial, contractual or legal issues which are normally in separate parts of an enquiry, - any allocation of responsibilities which are determined by the contract. This Guide does not prescribe the arrangement of the documents in the enquiry. NOTE: As a comprehensive European environmental policy is still under preparation, this Guide does not address the environmental implications of the equipment.

Guide for the procurement of power station equipment - Electrical equipment - Generators

ICS
27.100;29.160.20
CCS
K51
发布
2000-06-15
实施
2000-06-15



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved