K54 汽轮机及其辅助设备 标准查询与下载



共找到 230 条与 汽轮机及其辅助设备 相关的标准,共 16

Specifications for steam turbines

ICS
27.040
CCS
K54
发布
2012-05-21
实施

Glossary of terms for thermal power plant -- Steam turbines and auxiliary equipment of thermal and geothermal power plant

ICS
01.040.27;27.040
CCS
K54
发布
2012-05-21
实施

Fired Steam Generators; Errata

ICS
27.040
CCS
K54
发布
2012-02
实施

Includes practices that are concerned primarily with the prevention of water damage to steam turbines used for water-cooled nuclear reactor power generation.

Prevention of Water Damage to Steam Turbines Used for Electric Power Generation: Nuclear Fueled Plants

ICS
27.040
CCS
K54
发布
2012
实施

本标准规定了在役汽轮机组检修时,适用A型脉冲反射式超声波探伤仪,以单探头接触法为主进行汽轮机叶片(叶身及叶根)的超声波检验和判定方法。 本标准适用于汽轮机叶片的叶身和叶根超声波检验。

Technical guide for the ultrasonic testing of turbine-blades

ICS
27.100
CCS
K54
发布
2011-07-28
实施
2011-11-01

This document describes a recommended practice and procedure for the trending of parameters to maintain the test cell correlation status. Trending is performed to monitor test cells for changes that can affect engine performance or the data acquired from engine tests.

Trend Analysis for Maintaining Correlation of Gas Turbine Engine Test Cells

ICS
27.040
CCS
K54
发布
2011-03-10
实施

Comprehensive Utilization of Resources Thermal Power Plant Safety Production Code Part 4: Steam Turbine

ICS
27.100
CCS
K54
发布
2011-01-25
实施
2011-03-01

本部分规定了湿冷发电机组凝结水精处理的基本方法和技术要求。 本部分适用于由直流锅炉和亚临界参数汽包锅炉供汽的汽轮机组的凝结水精处理。

Technique requirements of condensate polishing in thermal power plant. Part1:Water-cooled unit

ICS
27.100
CCS
K54
发布
2011-01-09
实施
2011-05-01

本标准规定了凝汽器胶球清洗装置(包括收球网、胶球泵、装球室、分汇器、控制柜、阀门等)和循环水二次过滤装置(二次滤网、控制柜、排污阀等)的术语、设备型号编制方法及参数系列、技术要求、试验及检验、验收、标志、油漆、防锈、包装、运输、储存等基本要求。 本标准适用于凝汽器用胶球清洗装置和二次滤网装置,其他行业用胶球清洗装置和二次滤网装置可参照本标准。采用特种防腐材料或其他防腐措施制造的适用于海水的胶球清洗装置和二次滤网装置,其材质、工艺、试验及检验等还应符合有关标准和技术文件的规定。

Condenser tube rubber ball cleaning equipment and cooling water debris filter

ICS
27.100
CCS
K54
发布
2011-01-09
实施
2011-05-01

本标准规定了发电厂表面式凝汽器及辅机冷却器管材的选用原则和方法。 本标准适用于火力发电厂、核能发电厂表面式凝汽器及以水为冷却介质的表面式换热器管材的选用。

Guideline for the selection of condenser and auxiliary cooler tube materials in power plant

ICS
27.040
CCS
K54
发布
2011-01-09
实施
2011-05-01

Steam Turbines in Combined Cycles

ICS
27.040
CCS
K54
发布
2011
实施

This document provides procedures for the accurate testing of steam turbines in combined cycles. It is the intent of this Code that accurate instrumentation and measurement techniques be used to determine performance. In planning and running the test, the Code user must strive to follow the procedures in this Code to meet the uncertainty requirements.

Steam Turbines in Combined Cycles

ICS
27.040
CCS
K54
发布
2011
实施
2011-10-21

This guidance document provides an application guide on how to utilize ASME EA-3, Energy Assessment forSteam Systems. This guidance document provides background and supporting information to assist in applying thestandard.

Guidance for ASME EA-3, Energy Assessment for Steam Systems [ANSI designation: ASME TR EA-3G-2010] (EA-3G - 2010)

ICS
27.040
CCS
K54
发布
2010
实施
2010

本标准规定了火力发电厂热工保护系统在电源、逻辑、保护系统配置及设备选择等方面应遵循的设计原则和设计方法。 本标准适用于汽轮发电机组容量为 125MW-1000MW 级的凝汽式火力发电厂新建、扩建和改建工程的设计,也适用于 50MW 级及以上的供热式机组的热电厂设计。

Technical code for design of I&C protection system in fossil fuel power plant

ICS
27.100
CCS
K54
发布
2009-07-22
实施
2009-12-01

本标准适用于除氧加热器和具有表面式排气凝结装置或者装备有混合式排气凝结装置的除氧器。

Performance test code on deaerators operation in power plan

ICS
27.063.30
CCS
K54
发布
2009-07-22
实施
2009-12-01

This Code includes:(a) sample selection(b) sample collection and conditioning(c) sample analysis(d) data analysis

Steam and Water Sampling, Conditioning, and Analysis in the Power Cycle

ICS
27.040
CCS
K54
发布
2008-08-06
实施

The object of this Standard is to specify and discuss the methods and instrumentation for testing boiler make-up and feedwater, steam, and condensate in relation to performance testing as may be required in Performance Test Codes in one-time acceptance testing, and in continuous performance monitoring. This Standard also provides guidance to powerplant management, engineers, chemists, and operators in the design and operation of sampling systems for monitoring of cycle chemistry. The methods and equipment recommended herein may be useful for monitoring other influent and effluent streams of the power plant. Contamination of the steam and water cycle must be at or less than the maximum specified for the performance test before a turbine, condenser or deaerator performance test is made.

Steam and Water Sampling, Conditioning and Analysis in the Power Cycle

ICS
27.100
CCS
K54
发布
2008
实施

本标准规定了表面式凝汽器运行性能试验的仪表选用、试验程序和试验数据处理等的基本原则和要求。 本标准适用于水冷表面式凝汽器运行性能试验,不适用高于大气压力下运行的凝汽器和空冷凝汽器的性能试验。

Performance test code on steam surface condensers operation

ICS
27.100
CCS
K54
发布
2007-12-03
实施
2008-06-01

The guide of ultrasonic inspection for welding of steam turbine shaft

ICS
27.040
CCS
K54
发布
2005-02-14
实施
2005-06-01

This Code covers steam traps which are devices used in removing condensate and non-condensibles from steam systems.

Steam Traps

ICS
27.040
CCS
K54
发布
2005
实施



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号