GB/T 28029.3-2020
Electronic railway equipment—Train communication network (TCN)—Part2-2: Wire Train Bus(WTB)conformance testing

Standard No.
GB/T 28029.3-2020
Language
Chinese
Release Date
2020
Published By
General Administration of Quality Supervision, Inspection and Quarantine of the People‘s Republic of China
Lastest
GB/T 28029.3-2020
Replace
GB/T 28029.2-2011
Scope
This part of GB/T 28029 specifies the conformance test method, requirements and boundaries, conformance test of WTB nodes, backbone cables, jumper cables and extension cables, RTP conformance test, conformance test of WTB marshalling and network management conformance test. This section applies to all equipment and devices implemented in accordance with GB/T 28029.2. This section covers the certification of these equipment and devices.

GB/T 28029.3-2020 Referenced Document

  • GB/T 25119 Railway applications—Electronic equipment used on rolling stock*2021-12-31 Update
  • GB/T 25119-2010 Railway applications.Electronic equipments used on rail vehicles

GB/T 28029.3-2020 history

  • 2020 GB/T 28029.10-2020 Electronic railway equipment—Train communication network(TCN)—Part 3-2:Multifunction Vehicle Bus(MVB)conformance testing
  • 2011 GB/T 28029.2-2011 Electric railway equipment.Train bus.Part 2:Train communication network conformance testing

GB/T 28029.3-2020 -All Parts

GB/T 28029.1-2020 Electronic railway equipment—Train communication network (TCN)—Part 1: General architecture GB/T 28029.10-2020 Electronic railway equipment—Train communication network(TCN)—Part 3-2:Multifunction Vehicle Bus(MVB)conformance testing GB/T 28029.11-2020 Electronic railway equipment—Train communication network(TCN)—Part 3-3:CANopen Consist Network(CCN) GB/T 28029.12-2020 Electronic railway equipment—Train communication network (TCN)—Part 3-4: Ethernet Consist Network(ECN) GB/T 28029.2-2020 Electronic railway equipment—Train communication network (TCN)—Part 2-1: Wire Train Bus(WTB) GB/T 28029.3-2020 Electronic railway equipment—Train communication network (TCN)—Part2-2: Wire Train Bus(WTB)conformance testing GB/T 28029.4-2020 Electronic railway equipment—Train communication network (TCN)—Part2-3: TCN communication profile GB/T 28029.5-2020 Electronic railway equipment—Train communication network (TCN)—Part 2-4: TCN communication profile GB/T 28029.6-2020 Electronic railway equipment—Train communication network (TCN)—Part 2-5: Ethernet Train Backbone(ETB) GB/T 28029.7-2020 Electronic railway equipment—Train communication network (TCN)—Part 2-6: On-board to ground communication GB/T 28029.8-2020 Electronic railway equipment—Train communication network (TCN)—Part 2-7: Radio based Wireless Train Backbone (WLTB) GB/T 28029.9-2020 Electronic railway equipment—Train communication network(TCN)—Part 3-1: Multifunction Vehicle Bus(MVB)



Copyright ©2007-2023 ANTPEDIA, All Rights Reserved