共找到 770 条与 金属设备与工艺管道安装工程 相关的标准,共 52 页
本规范适用于公称直径为50mm~1400mm,输送介质温度在120℃~350℃范围内,工作管压力不大于2. 5MPa的高温管道保温。
Technical specification for thermal insulation of directly buried high temperature steel pipeline
Metallic industrial piping - Part 8: Additional requirements for aluminium and aluminium alloy piping; German version EN 13480-8:2012/A1:2014
Metallic industrial piping - Part 5: Inspection and testing; German version EN 13480-5:2012, Corrigendum to DIN EN 13480-5:2013-11
Plastics piping systems for soil and waste discharge (low and high temperature) within the building structure. Thermoplastics. Recommended practice for installation
Cette partie de l'EN 1329 spécifie les exigences pour les tubes à paroi compacte en poly(chlorure de vinyle) non plastifié (PVC-U), les raccords et le système destinés à être utilisés pour :- les applications d'évacuation des eaux-vannes et des eaux usées (à basse et à haute température) à l'intérieur des bâtiments (code de zone d'application "B") ;- les applications d'évacuation des eaux-vannes et des eaux usées (à basse et à haute température) utilisables aussi bien à l'intérieur des bâtiments qu'en enterré dans la structure du bâtiment (code de zone d'application "BD").Cette partie de l'EN 1329 est également applicable aux tubes en PVC-U, raccords et le
Plastics piping systems for soil and waste discharge (low and high temperature) within the building structure - Unplasticized poly(vinyl chloride) (PVC-U) - Part 1 : specifications for pipes, fittings and the system
本规范适用于材质为碳钢或低合金钢,板厚度大于或等于6mm的立式圆筒形钢制焊接储罐罐壁、罐底和罐顶的埋弧自动焊、气电立焊和熔化极气体保护自动焊(含自保护药芯焊丝)的焊接施工。
Technical specification for automatic welding of vertical circular welding steel storage tanks
Code Cases to B31.3 Process Piping
Interpretations to B31.1 Power Piping (Includes Interpretations No. 2 through 6@ 8 through 10@ 13@ 15@ 17 through 25@ 27 through 31@ and 42 through 47)
INTERPRETATIONS to B31.3 - 2010 Process Piping (Includes Interpretations No. 1 Through 24)
本标准规定了钢质管道熔结环氧粉末外涂层的技术要求。本标准适用于钢质管道(包括钢质直管及热煨弯管,以下简称钢管)单层、双层结构熔结环氧粉末外涂层的设计、施工及检验。经过涂敷的钢管可用于工作温度为-30℃~80℃的埋地或水下环境,其他工况可参照执行。
Technological specification of external fusion bonded epoxy coating for steel pipeline
本规程适用于输送介质为气体、液体和浆体的长输管道及油气田集输管道的安装焊接,管道材质为碳素钢、低合金钢、奥氏体不锈钢、不锈钢复合管,焊接方法为钨极氩弧焊、焊条电弧焊、熔化极气体保护电弧焊(包括自保护半自动焊、气保护半自动焊、气保护自动焊)、埋弧焊,以及上述焊接方法相互组合的方法。
Welding specification for steel pipeline
Metallic industrial piping - Part 8: Additional requirements for aluminium and aluminium alloy piping; German version EN 13480-8:2012
Metallic industrial piping - Part 6: Additional requirements for buried piping; German version EN 13480-6:2012
Metallic industrial piping - Part 4: Fabrication and installation; German version EN 13480-4:2012
Metallic industrial piping - Part 5: Inspection and testing; German version EN 13480-5:2012
Metallic industrial piping - Part 2: Materials; German version EN 13480-2:2012
Metallic industrial piping - Part 3: Design and calculation; German version EN 13480-3:2012
Metallic industrial piping - Part 1: General; German version EN 13480-1:2012
Pressure pipelines made from thermoplastics materials - Metal and plastics compression fittings for polyethylene (PE) pipes - General quality requirements and testing; Text in German and English
Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号