P94 金属设备与工艺管道安装工程 标准查询与下载



共找到 770 条与 金属设备与工艺管道安装工程 相关的标准,共 52

Metallic industrial piping - Part 8: Additional requirements for aluminium and aluminium alloy piping; German version EN 13480-8:2012, Corrigendum to DIN EN 13480-8:2014-12

ICS
23.040.01;23.040.15
CCS
P94
发布
2016-10
实施

Metallic industrial piping - Part 4: Fabrication and installation; German version EN 13480-4:2012, Corrigendum to DIN EN 13480-4:2014-12

ICS
23.040.01
CCS
P94
发布
2016-10
实施

Metallic industrial piping - Part 6: Additional requirements for buried piping; German version EN 13480-6:2012/A1:2016

ICS
23.040.01
CCS
P94
发布
2016-10
实施

Metallic industrial piping - Part 1: General; German version EN 13480-1:2012, Corrigendum to DIN EN 13480-1:2014-12

ICS
23.040.01
CCS
P94
发布
2016-10
实施

Metallic industrial piping - Part 5: Inspection and testing; German version EN 13480-5:2012, Corrigendum 2 to DIN EN 13480-5:2014-12

ICS
23.040.01
CCS
P94
发布
2016-10
实施

Metallic industrial piping - Part 3: Design and calculation; German version EN 13480-3:2012, Corrigendum 2 to DIN EN 13480-3:2014-12

ICS
23.040.01
CCS
P94
发布
2016-10
实施

ASME B31.1 prescribes minimum requirements for the design, materials, fabrication, erection, test, inspection, operation, and maintenance of piping systems typically found in electric power generating stations, industrial and institutional plants, geothermal heating systems, and central and district heating and cooling systems. It also covers boiler-external piping for power boilers and high-temperature, high pressure water boilers in which steam or vapor is generated at a pressure of more than 15 psig; and high temperature water is generated at pressures exceeding 160 psig and/or temperatures exceeding 250 degrees F. Key changes to this revision include: Two additional Code Jurisdictional Limit figures have been added A revision to the Qualifications of the Owners Inspector has been made Requirements regarding Covered Piping System records have been moved from Nonmandatory Appendix V to Chapter VII

Power Piping

ICS
CCS
P94
发布
2016-06-30
实施
2016-06-29

本规范适用于设计压力不大于32MPa、设计温度为-20℃~360℃的陆上油田和设计压力不大于70MPa的陆上气田集输管道工程的施工质量验收。 本规范不适用于下列情况下的油气田集输管道工程施工质量验收: 1输送天然气中HS体积分数大于或等于5%。 2单独进行设计的穿跨越工程。

Code for quality acceptance of oil and gas construction engineering.Oil-gas field gathering and transportation pipeline engineering

ICS
75.200
CCS
P94
发布
2016-01-07
实施
2016-06-01

本规范适用于石油天然气行业的立式圆筒形的玻璃钢储罐工程施工,储罐制造方式为现场立式缠绕,其他方式成型的大型玻璃钢储罐可参照采用。

Specification for construction of glass fiber reinforced thermosetting resin on-site winding vertical storage tanks

ICS
83.120.75.200
CCS
P94
发布
2016-01-07
实施
2016-06-01

本规范适用于新建或改(扩)建石油天然气长输管道及集输管道相关的站内工艺管道工程施工质量的验收。 本规范不适用于油气田内部脱水装置、站内泵、加热炉及其他类似设备本体所属管道,以及站内的高温导热油管道的施工质量验收。

Code for quality acceptance of oil and gas construction engineering.Station procedure pipeline project

ICS
75.200
CCS
P94
发布
2016-01-07
实施
2016-06-01

本规范适用于油田、气田、长输管道站场及油气库、炼油厂等现场组装焊接的钢制球形储罐(以下简称球罐)及立式圆筒形钢制焊接储罐(以下简称立式储罐)施工质量的验收。本规范中的“储罐”未做特殊说明时均指球罐和立式储罐,具体适用于下列工程的施工质量验收: 1设计压力大于或等于0.1MPa且不大于4MPa、公称容积大于或等于50m以支柱支撑的碳素钢和合金钢钢制球罐安装工程。 2储存石油、石化产品及其他类似液体的常压(包括微内压)立式储罐工程。 3储罐的涂装、绝热、梯子平台、栏杆等工程的施工质量验收。 本规范不适用于下列几类工程的施工质量验收: 1受核辐射作用的球罐。 2非固定的球罐。 3双层结构的球罐。 4膨胀成形的球罐。 5埋地立式储罐。 6储存极度和高度危害介质的立式储罐。 7人工制冷液体立式储罐。

Code for quality acceptance of oil and gas construction engineering.Storage tank project

ICS
75.200
CCS
P94
发布
2016-01-07
实施
2016-06-01

ASME B31Q establishes the requirements for developing and implementing an effective Pipeline Personnel Qualification Program. It specifies the requirements for identifying covered tasks that impact the safety or integrity of pipelines, for qualifying individuals to perform those tasks, and for managing the qualifications of pipeline personnel. With the following exceptions, this Standard applies to tasks that impact the safety or integrity of pipelines: design or engineering tasks and tasks that are primarily intended to ensure personnel safety.

Pipeline Personnel Qualification

ICS
CCS
P94
发布
2016
实施
2016-08-29

This Code applies to piping for all fluids including: (1) raw, intermediate, and finished chemicals; (2) petroleum products; (3) gas, steam, air and water; (4) fluidized solids; (5) refrigerants; and (6) cryogenic fluids. Also included is piping that interconnects pieces or stages within a packaged equipment assembly. Key changes to this revision include: ߦ Severe Cyclic Conditions ߦ MPa Allowable Stresses ߦ Expansion Joints ߦ Flange Joint Assembly ߦ Ultrasonic Examination Acceptance Criteria ߦ Category M Fluid Service Examination ߦ Leak Testing of Instrument Connections ߦ Leak Testing of Vacuum Systems ߦ Leak Testing of Insulated Systems ߦ Leak Testing of Assembled Piping

Process Piping (Includes Interpretation 25)

ICS
CCS
P94
发布
2016
实施
2016-01-01

1.1 This specification covers high strength, seamless pipe and tube of nickel alloys (UNS N07022, UNS N07725, UNS N07740, UNS N09945, UNS N09925, UNS N07718, UNS N10276, UNS N06985)2 as shown in Table 1. (A) Minimum: The element may be determined arithmetically by difference.(B) Remainder: The element may be determined arithmetically by difference. 1.2 Pipe and tube shall be supplied in the cold worked or cold worked and precipitations hardened or solution annealed plus precipitation hardened and descaled conditions. When atmosphere control is used, descaling is not necessary. 1.3 The values stated in inch-pound units are to be regarded as standard. The values given in parentheses are mathematical conversions to SI units that are provided for information only and are not considered standard. 1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to become familiar with all hazards including those identified in the appropriate Safety Data Sheet (SDS) for this product/material as provided by the manufacturer, to establish appropriate safety, health, and environmental practices, and determine the applicability of regulatory limitations prior to use. 1.5 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.

Standard Specification for Precipitation Hardened or Cold Worked, Seamless Nickel Alloy Pipe and Tube

ICS
23.040.15
CCS
P94
发布
2016
实施

ASME B31.3 contains requirements for piping typically found in petroleum refineries; chemical, pharmaceutical, textile, paper, semiconductor, and cryogenic plants; and related processing plants and terminals. It covers materials and components, design, fabrication, assembly, erection, examination, inspection, and testing of piping. This Code applies to piping for all fluids including: (1) raw, intermediate, and finished chemicals; (2) petroleum products; (3) gas, steam, air and water; (4) fluidized solids; (5) refrigerants; and (6) cryogenic fluids. Also included is piping that interconnects pieces or stages within a packaged equipment assembly. Key changes to this revision include: ? Category M fluid service definition revised ? Revision to the equation for allowable stress range ? Thermowell design ? Use of cold spring ? Impact testing of carbon steels ? Installation of Weldolets ? Preheat requirements ? Heat treatment requirements ? Qualification of examination personnel ? Acceptance criteria for liquid penetrant an magnetic particle examination ? Leak test for high pressure piping ? Alternative rules for evaluation of stress range B31.3 is one of ASME?s most requested codes. It serves as a companion to ASME?s B31.1 Code on Power Piping as well as to the other codes in ASME?s B31 series. Together, they remain essential references for anyone engaged with piping.

Process Piping (B31.3 - 2014)

ICS
CCS
P94
发布
2015/2/24
实施

ASME PCC-2 provides methods for repair of equipment and piping within the scope of ASME Pressure Technology Codes and Standards after it has been placed in service. These repair methods include relevant design, fabrication, examination, and testing practices and may be temporary or permanent, depending on the circumstances. The methods provided in this Standard address the repair of components when repair is deemed necessary based on appropriate inspection and flaw assessment. These inspection and flaw evaluation methods are not covered in this document, but are covered in other post-construction codes and standards. Only technical procedures and information are provided; administrative or policy requirements are outside of the scope of this Standard. Key changes to this revision include a new supplemental article on repair welding considerations for Cr-Mo steel pressure vessels, and updates to Article 2.2 on External Weld Buildup to Repair Internal Thinning and Article 4.1 on Nonmetallic Composite Repair Systems: High Risk Applications. ASME PCC-2 serves as a companion to the other codes in ASME?s PCC series. Together, they remain essential references for anyone engaged with pressure equipment and piping. Careful application of these ASME PCC codes will help users to comply with applicable regulations within their jurisdictions, while achieving the operational, cost and safety benets to be gained from the many industry best-practices detailed within these volumes. Intended for repair, maintenance, owners, regulators, inspectors, manufacturers, designers, and operators of pressure equipment and piping, plus all potential governing entities.

Repair of Pressure Equipment and Piping (PCC-2 - 2015)

ICS
CCS
P94
发布
2015/2/19
实施
2015-02-19

ASME B31.12 Standard on Hydrogen Piping and Pipelines contains requirements for piping in gaseous and liquid hydrogen service and pipelines in gaseous hydrogen service. The general requirements section covers materials, brazing, welding, heat treating, forming, testing, inspection, examination, operating, and maintenance. The industrial piping section covers requirements for components, design, fabrication, assembly, erection, inspection, examination, and testing of piping. This Code is applicable to piping in gaseous and liquid hydrogen service and to pipelines in gaseous hydrogen service. B31.12 is applicable up to and including the joint connecting the piping to associated pressure vessels and equipment but not to the vessels and equipment themselves. It is also applicable to the location and type of support elements, but not to the structure to which the support elements are attached. B31.12 is presented in the following parts: (a) Part GR ? General Requirements. This part contains definitions and requirements for materials, welding, brazing, heat treating, forming, testing, inspection, examination, operation, and maintenance. (b) Part IP ? Industrial Piping. This part includes requirements for components, design, fabrication, assembly, erection, inspection, examination, and testing of piping. (c) Part PL ? Pipelines. This part sets forth requirements for components, design, installation, and testing of hydrogen pipelines. It is required that each part be used in conjunction with the General Requirements section but independent of the other parts. It is not intended that this edition of this Code be applied retroactively to existing hydrogen systems. Key changes to this revision include: New Section GR-6.3 for Quality System Functions; New table for Required Nondestructive Examinations added to Chapter IP-10; New paragraphs for Quality Control Examinations, Extent of Required NDE Examainations, Acceptance Criteria, Procedures, and Types of Examination added to Chapter IP-10; Updated references throughout; Equations for thickness of permanent blanks and of straight pipe have been updated. B31.12 serves as a companion to the other codes in ASME?s B31 series on Pressure Piping. Together, they remain essential references for anyone engaged with piping.

Hydrogen Piping and Pipelines (B31.12 - 2014)

ICS
CCS
P94
发布
2015/2/17
实施

Scheme for the Identification of Piping Systems

ICS
CCS
P94
发布
2015-12-29
实施

A13.1 is intended to establish a common system to assist in identification of hazardous materials conveyed in piping systems and their hazards when released in the environment. This scheme concerns identification of contents of piping systems in industrial and power plants. It is also recommended for the identification of piping systems used in commercial and institutional installations, and in buildings used for public assembly. It does not apply to pipes buried in the ground nor to electrical conduits.

Scheme for the Identification of Piping Systems

ICS
CCS
P94
发布
2015/12/28
实施
2015-12-28

Metallic industrial piping - Part 8: Additional requirements for aluminium and aluminium alloy piping; German version EN 13480-8:2012/A2:2015

ICS
23.040.15
CCS
P94
发布
2015-12
实施



Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号